Promotion Area Heading
All Widgets
Promo Hero
Promo Hero
Anchor Button 1
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Anchor Button 2
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Anchor Button 3
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Anchor Button 4
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Highlight
Content Card 2
Content Card 3
Image Card 1
Image Card 2
Image Card 3
Standard Image Callout
Standard Image Callout
Video Callout
Bold Image Callout
Featured Stats
Icon Card 1
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Icon Card 2
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Icon Card 3
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Company Highlights
Nearly 60% Carbon-Free Resources
Carbon-Free Resources
2020 Women on Board Distinction
4 of 10 NWE board members are female
27:1 CEO to Average Employee Pay
Our peer group average at 37:1
5th Best Rated Utility for Governance
by Moody's Investor Services
Frequently Asked Questions
What are the next procedural steps for NorthWestern Energy’s large new load tariff rule proposal to the Montana Public Service Commission?
The Montana Public Service Commission is the authority for reviewing and approving electric tariffs in Montana. NorthWestern Energy’s March 31, 2026 application initiates a public regulatory proceeding that will include opportunities for review and public comment consistent with Montana Public Service Commission procedures. NorthWestern Energy’s priority throughout the process is to provide safe, reliable energy service to customers at affordable rates.
What challenges are associated with serving large-load customers?
Large-load projects require careful planning and oversight.
Serving large customers may require system studies, infrastructure upgrades, customer commitments and regulatory review. The key challenge is making sure growth occurs in a way that supports reliability, affordability and customer protection.
That is why NorthWestern Energy’s proposed framework includes new large load customer-funded studies, development agreements, standardized review processes and additional requirements for the largest projects.
Who reviews and approves these large new load agreements?
The proposed framework is subject to regulatory oversight.
In addition, projects larger than 50 MW require regulatory approval of an electric service agreement that must be approved before service begins. This oversight helps ensure transparency and customer protections are maintained.
Is there a review process before a large-load customer can connect to the system?
Yes. Large-load projects go through a structured review process before service begins. Depending on the project, that process may include:
- A development agreement.
- A large new load customer-funded development deposit for engineering and planning studies.
- Study queue requirements that help ensure projects are reviewed in an orderly manner.
- Commission review of electric service agreements for loads greater than 50 MW.
This process helps ensure projects are appropriately planned before they are connected to the electric system.
How does the tariff rule support reliable electric service?
Reliability comes first.
Before a large-load customer is connected, NorthWestern Energy evaluates system impacts, infrastructure needs and operational requirements. The proposed framework also notes that certain large-load customers can improve system efficiency through high-load factors and, in some cases, provide operational flexibility that supports reliable service.
The goal is to ensure growth occurs in a way that maintains reliable service for all customers.
Do large-load customers get their own dedicated energy resource?
No.
Under the proposed framework, large-load customers are not assigned a dedicated resource. They receive service from NorthWestern Energy's overall energy portfolio, just like other bundled customers.
What happens if a large-load customer stops operating or leaves early?
Are large-load customers getting special rates?
Will a large new load tariff rule increase my electric bill?
How does the large new load tariff protect existing customers?
Protecting existing customers is the primary goal of the large new load tariff rule. Montana customers will never subsidize data center energy costs. Those costs will not be shifted to Montana households, small businesses, farms or ranches.
Under the Large New Load Tariff, data centers will pay their fair share of infrastructure costs. Your rates only reflect the energy you use — new growth will not increase what you pay.
The proposed framework is built around a simple principle: existing customers should not pay for infrastructure needed to serve new large-load growth. Instead, the large-load customers are responsible for the grid and other energy infrastructure investments needed to serve their projects.
Regulatory oversight ensures no cost-shifting occurs for other customers.
- Direct assignment of project-specific costs to the large-load customer.
- Surcharges and reservation fees to cover system upgrades and help prevent cost shifting.
- Minimum billing requirements help ensure customers pay for infrastructure built to serve their project.
- Long-term commitments and exit provisions designed to reduce the risk of stranded costs.
- Financial assurances, such as collateral requirements, based on the customer's financial standing.
- Regulatory oversight and commission review of certain large-load agreements.
What size customer qualifies under the large new load tariff?
What is a large new load tariff rule?
Why is NorthWestern Energy proposing a large new load tariff rule?
Montana is attracting interest from businesses that can bring jobs, investment and long-term economic opportunities to the state.
A large new load tariff rule provides a transparent framework for serving these customers, planning for future energy needs and helping ensure costs are assigned appropriately. The framework is designed to support growth while protecting existing customers and maintaining system reliability.
What are the benefits of a large new load tariff?
- Support responsible economic growth and investment in Montana.
- Create a transparent process for evaluating and serving new large-load customers.
- Help ensure costs are assigned to the customers driving new infrastructure investments.
- Maintain regulatory oversight and accountability.
- Support long-term affordability by spreading fixed system costs across additional energy use.
- Strengthen the grid through planned and structured growth.
Why is NorthWestern Energy trimming my tree?
Your tree is being trimmed because it is located on a distribution circuit that was identified through outage data analysis or on a circuit located in an area identified as having an elevated wildfire risk. Vegetation management helps reduce the risk of power outages, equipment damage and wildfire-related impacts while maintaining safe and reliable electric service.
Why was my tree selected for trimming?
How will I know if tree work is planned in my area?
Why is my tree marked with ribbon or paint?
What happens to branches and debris after trimming?
Who is responsible for trimming trees near power lines?
Team Members
NorthWestern Energy, City of Missoula, Missoula County and City of Bozeman File Proposed Green Power Program with Montana Public Service Commission
Date: Sep 15, 2026
TYPE: News
Butte, Mont. – Sept. 15, 2026 – NorthWestern Energy, the City of Missoula, Missoula County and the City of Bozeman filed a joint application today with the Montana Public Service Commission for a proposed Green Power Program.
The program would allow interested communities and businesses to support development of a new renewable energy resource located in Montana and give residential customers in those communities an opportunity to support those environmental priorities. The proposed program was developed collaboratively to support local sustainability initiatives, expand customer options and help participating customers pursue renewable energy goals through voluntary participation.
• Measures intended to ensure non-participating customers do not bear program costs.
“The proposed Green Power Program reflects a practical, customer-driven approach that addresses evolving community interests and customer demand for additional renewable energy options while ensuring only participants bear any additional costs and receive the benefits of participation," said NorthWestern Energy Director Regulatory Affairs Charlie Lane. “NorthWestern Energy, the City of Missoula, Missoula County and the City of Bozeman have worked together to develop a program tailored to Montana customers and communities. Filing this application marks an important milestone in that work."
“We are so pleased to mark another milestone in moving this project forward,” Missoula Mayor Andrea Davis said. “Years of collaborative work have brought an outstanding project that could support new renewable energy resources in Montana and offer customers voluntary options. We’re looking forward to the next steps with the PSC.”
“This program has been years in the making, and we're thrilled to see it reach this crucial milestone,” said Missoula County Commissioner Josh Slotnick. “The Green Power Program will give more communities, businesses and households the opportunity to support new, Montana-based renewable energy.”
“Filing the Green Power Program at the Public Service Commission is an important step forward for Bozeman residents,” said Bozeman Mayor Joey Morrison. “We know both residents and businesses have been asking for the option to sign up for Montana-made renewable energy. This is an opportunity that could benefit not just our local community but the entire state, and we’re looking forward to hearing what the Commission decides."
Follow us on Facebook and LinkedIn and Instagram: @NorthWesternEnergy
NorthWestern Energy - Delivering a Bright Future
NorthWestern Energy provides essential energy infrastructure and valuable services that enrich lives and empower communities while serving as long-term partners to our customers and communities. We work to deliver safe, reliable, and innovative energy solutions that create value for customers, communities, employees, and investors. We do this by providing low-cost and reliable service performed by highly-adaptable and skilled employees. We provide electricity and / or natural gas to approximately 850,300 customers in Montana, South Dakota, Nebraska, and Yellowstone National Park. Our operations in Montana and Yellowstone National Park are conducted through our subsidiary, NW Corp, and our operations in South Dakota and Nebraska are conducted through our subsidiary, NWE Public Service. We have provided service in South Dakota and Nebraska since 1923 and in Montana since 2002.
Media Contacts:
Jo Dee Black
866-622-8081
Section Title with Button
Section Title No Button
NorthWestern Energy makes it easy to manage your energy account. Here are just a few things available to you when you register!
- Track your electric and natural gas use
- Make payment arrangements or get assistance
- Register for EZ Pay
- Make a one-time payment
- Sign up for paperless billing
- Report a power outage
- Start, stop, or move service
Electric Rates (web site)
Link Card List
Featured Media
Delivering a Bright Future
Bright Stories: Preventing Wildfires
Bright Stories: Osprey Program
Bright Stories: Montana Meter Upgrade
Bright Stories: LED Streetlights
Bright Stories: Archie Bray Foundation
Bright Stories: O'Dell Creek
Bright Stories: Exploration Works
Bozeman Solar Pilot
Bright Stories: Powering Generations
Bright Stories: River Recreation
Thompson Falls Fish Ladder: How We Track Fish
A Bird's-Eye View of the Thompson Falls Fish Ladder
The Future of Distribution Operations and Planning
Bright Stories: Community Vitality
Bright Stories: River Conservation
Image Test
Yet Another Video Test
Another Video Test
-
Bright Magazine
Last post : 12/1/2025
-
test
-
Recipes
-
Events
-
events
Last post : 1/30/2023
-
Test Blog 1
Last post : 3/2/2021
-
Bright Magazine: Environment 2025
Dec 1, 2025, 14:50 PM by Erin MadisonThe 2025 Environment issue of Bright magazine is now available to read online.Full story -
new event test 1
Aug 23, 2022, 12:25 PM by User Not Foundblog testFull story -
Test Blog 2 Post 1
Mar 2, 2021, 11:47 AM by User Not FoundTest Blog 2 Post 1 summaryFull story -
Blog Post 3
Mar 2, 2021, 11:29 AM by User Not FoundBlog Post 3 Summary.Full story -
Blog Post 2
Mar 2, 2021, 10:58 AM by User Not FoundBlog Post 2 Summary.Full story -
Blog Post 1
Mar 2, 2021, 10:58 AM by User Not FoundBlog Post 1 Summary.Full story